Sunday, December 25, 2005

Winter Project

I've begun working on a "low profile" kit for Schuykill Junction. This area of the layout is against a backdrop, and this building will only project out about an inch.

This kit is designed for just such an installation.

Once the structure has a defined form, I shall attach a photo. At this point in time, the individual walls are layed out, and windows and glazing have been applied.

Much needs to be yet done..........roof cut and detailed, fire escapes need to be assembled, then it all needs to be assembled together. Once assembled, then "weathered". The last step will be the actual installation on the layout.

To be continued................